[Image1][Fuji Bridge under demolition]The width of the old bridge was narrow, but the width of the new bridg

[Fuji Bridge under demolition]

The width of the old bridge was narrow, but the width of the new bridge was Restrooms available.
It's 😊 comfortable

The length of the new bridge is 304 m and it was completed in August of 2023 (Reiwa 5).

This text has been automatically translated.
Show original text Hide original text