[Phantom road "Chobochinai routes" will open again this year for a limited time]
The "phantom road" Chobochinai routes, which has been closed for a long time, will open a little earlier this year as well!
📅 Friday, August 22, 2025 11:00~
■ What is the Phantom Path?
This road is only open for about one month from mid-September to mid-October every year
It is a very limited route.
It is called the "phantom road" because it can be passed only when the water level is at its lowest.
Especially in early October, it coincides with the Best time to visit of Autumn leaves, and it is a popular Spot that is visit by many people from inside and outside Hokkaido.
📌 Opening section
Route 1116 (Chobochinai Gate to Higashikawa Kita Line 7 Gate)
📅 Opening date and time
Friday, August 22, 2025 11:00 a.m.
* Thereare may be changed or canceled depending on weather and road surface conditions.
* The timing of the winter closure is undecided at this time.
🚧 Attention
The sidewalks are not Maintenance, and There are are narrow in some places.
Please be careful of passing each other, sharp curves, and road surface conditions between cars.
While enjoying the Nature of the East River, please drive safely.
PS. The photos were taken in the past.
Show original text